Journal article
Built Environment Project and Asset Management, Emerald publication, vol. 10(1), 2019, pp. 124-139
APA
Click to copy
Rethnam, O. R., Palaniappan, S., & Velmurugan, A. (2019). Life cycle cost analysis of 1MW power generation using roof-top solar PV panels. Built Environment Project and Asset Management, Emerald Publication, 10(1), 124–139. https://doi.org/10.1108/BEPAM-12-2018-0161
Chicago/Turabian
Click to copy
Rethnam, Omprakash Ramalingam, Sivakumar Palaniappan, and Ashokkumar Velmurugan. “Life Cycle Cost Analysis of 1MW Power Generation Using Roof-Top Solar PV Panels.” Built Environment Project and Asset Management, Emerald publication 10, no. 1 (2019): 124–139.
MLA
Click to copy
Rethnam, Omprakash Ramalingam, et al. “Life Cycle Cost Analysis of 1MW Power Generation Using Roof-Top Solar PV Panels.” Built Environment Project and Asset Management, Emerald Publication, vol. 10, no. 1, 2019, pp. 124–39, doi:10.1108/BEPAM-12-2018-0161.
BibTeX Click to copy
@article{omprakash2019a,
title = {Life cycle cost analysis of 1MW power generation using roof-top solar PV panels},
year = {2019},
issue = {1},
journal = {Built Environment Project and Asset Management, Emerald publication},
pages = {124-139},
volume = {10},
doi = {10.1108/BEPAM-12-2018-0161},
author = {Rethnam, Omprakash Ramalingam and Palaniappan, Sivakumar and Velmurugan, Ashokkumar}
}